<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Frame Advisory</title>
	<atom:link href="https://frameadvisory.ca/feed/" rel="self" type="application/rss+xml" />
	<link>https://frameadvisory.ca/</link>
	<description></description>
	<lastBuildDate>Mon, 26 Oct 2026 17:20:24 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>

<image>
	<url>https://frameadvisory.ca/wp-content/uploads/2026/09/cropped-favicon-32x32.png</url>
	<title>Frame Advisory</title>
	<link>https://frameadvisory.ca/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Stalled development project? Five times to call FRAME</title>
		<link>https://frameadvisory.ca/blog/five-times-to-call-frame/</link>
		
		<dc:creator><![CDATA[FrameAdvisory]]></dc:creator>
		<pubDate>Mon, 26 Oct 2026 17:15:48 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<guid isPermaLink="false">https://frameadvisory.ca/?p=164</guid>

					<description><![CDATA[<p>The situations that usually come before the first conversation. Stalled development projects rarely announce that they’re in trouble. They show up as a feeling in the room: the meetings keep happening, the drawings keep improving, and nothing moves. Here are...</p>
<p>The post <a href="https://frameadvisory.ca/blog/five-times-to-call-frame/">Stalled development project? Five times to call FRAME</a> appeared first on <a href="https://frameadvisory.ca">Frame Advisory</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading has-tertiary-color has-text-color has-link-color wp-elements-3">The situations that usually come before the first conversation.</h2>



<div class="wp-block-columns is-layout-flex wp-container-core-columns-is-layout-056641ad wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow" style="flex-basis:33.33%">
<p class="wp-block-paragraph">Stalled development projects rarely announce that they’re in trouble. They show up as a feeling in the room: the meetings keep happening, the drawings keep improving, and nothing moves. Here are the situations I get called into most often, and what tends to change once someone senior is holding the whole picture.</p>



<p class="wp-block-paragraph"><strong>1. The project was designed for a market that no longer exists</strong></p>



<p class="wp-block-paragraph">Most of these projects were sound when they started. The land bought, the market was demanding, approvals were hard won, and the pro forma worked. Then rates moved, costs changed, or revenue softened, and the assumptions underneath it stayed where they were.</p>



<p class="wp-block-paragraph">Nobody did anything wrong. Individual numbers get updated along the way, a cost estimate here, a rent assumption there, but the project as a whole often isn’t rerun under the new conditions, because everyone is busy getting to the next milestone. The first step is that full retest: what still holds, what doesn’t, and what can change without reopening approvals. Often the answer is a different unit mix, tenure, or phasing, not a different project.</p>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow" style="flex-basis:66.66%">
<figure class="wp-block-image size-large"><img fetchpriority="high" decoding="async" width="960" height="1200" src="https://frameadvisory.ca/wp-content/uploads/2026/10/Approved-2024-Architectural-Sketch-1-960x1200.png" alt="" class="wp-image-166" srcset="https://frameadvisory.ca/wp-content/uploads/2026/10/Approved-2024-Architectural-Sketch-1-960x1200.png 960w, https://frameadvisory.ca/wp-content/uploads/2026/10/Approved-2024-Architectural-Sketch-1-480x600.png 480w, https://frameadvisory.ca/wp-content/uploads/2026/10/Approved-2024-Architectural-Sketch-1-767x959.png 767w, https://frameadvisory.ca/wp-content/uploads/2026/10/Approved-2024-Architectural-Sketch-1.jpg 1122w" sizes="(max-width: 960px) 100vw, 960px" /></figure>
</div>
</div>



<p class="wp-block-paragraph"><strong>2. The issues have started having their own issues</strong></p>



<p class="wp-block-paragraph">Rental replacement affects phasing. Phasing affects servicing. Servicing affects cost. Cost affects viability. Each consultant has a separate mandate and a reasonable position, and each is right about their own piece. </p>



<p class="wp-block-paragraph">What’s missing is someone looking across all of it. Pull one thread and the others move, so a fix in one area quietly creates a problem in another. A senior lead can map how the pieces depend on each other, decide which one to resolve first, and give the team a sequence they can all work to.</p>



<p class="wp-block-paragraph"><strong>3. The project is moving. The decisions aren’t.</strong></p>



<p class="wp-block-paragraph">There’s a steady rhythm of meetings, updates, and revised drawings, but the decisions that would unlock the next phase keep waiting for someone else. Often nobody has been clear about who decides what, by when, and on what information. Ownership, investors, and the project team can each be waiting on the others.</p>



<p class="wp-block-paragraph">The fix is usually simpler than it feels. Define who has authority over which decisions, put the question in a form someone can actually answer, and set a date. A project with clear decision rights moves at a different pace.</p>



<p class="wp-block-paragraph"><strong>4. Approvals are advancing and nobody has retested the numbers since the rates changed</strong></p>



<p class="wp-block-paragraph">An approval feels like a finish line, and it’s natural to treat it as one. Zoning is in place, the application is moving, and the sense in the room is that the hard part is done. Meanwhile the financial assumptions behind the project may be a year or two old, and the question worth asking at this point is: if we got everything we applied for, would the project still work?</p>



<p class="wp-block-paragraph">Approval tells you what you’re allowed to build. It doesn’t tell you what’s viable, financeable, or buildable at today’s costs. Checking now is cheap. Checking after the next large spend isn’t. The useful version of this work is a plain retest of the project against current numbers, so the team knows what it’s approving toward.</p>



<p class="wp-block-paragraph"><strong>5. You need senior leadership in the room, not another full-time hire</strong></p>



<p class="wp-block-paragraph">Teams in this spot often conclude they need someone more senior and start a hiring process. It makes sense, but a search takes months, and the problem usually has a shorter shelf life than that. By the time the new person has started, the decision window may have closed.</p>



<p class="wp-block-paragraph">What many of these projects need is someone who has done this before, in the room for the stretch that matters: the approvals, the repricing, the stalled decision. Then they hand it back clean. That’s the case for fractional leadership. It brings experience when the project needs it, and ends when the need does.</p>



<h2 class="wp-block-heading has-tertiary-color has-text-color has-link-color wp-elements-4"><strong>If one of these sounded familiar</strong></h2>



<p class="wp-block-paragraph">Most projects I’m called into have two or three of these at once, and they’re usually connected. That’s normal. It means there’s likely one underlying issue to find, not five separate ones.</p>



<p class="wp-block-paragraph">If a project of yours is stalled, shifting, or quietly getting more complicated, <a href="https://frameadvisory.ca/contact/" data-type="link" data-id="https://frameadvisory.ca/contact/">start a conversation.</a></p>


<div class="yoast-breadcrumbs"><span><span><a href="https://frameadvisory.ca/">Home</a></span></span></div>


<p class="wp-block-paragraph"></p>
<p>The post <a href="https://frameadvisory.ca/blog/five-times-to-call-frame/">Stalled development project? Five times to call FRAME</a> appeared first on <a href="https://frameadvisory.ca">Frame Advisory</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>A frame does two things</title>
		<link>https://frameadvisory.ca/blog/a-frame-does-two-things/</link>
		
		<dc:creator><![CDATA[FrameAdvisory]]></dc:creator>
		<pubDate>Tue, 13 Oct 2026 20:44:21 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<guid isPermaLink="false">https://frameadvisory.ca/?p=153</guid>

					<description><![CDATA[<p>Why the name FRAME: the structure that holds a project up, and the skill of framing how it’s seen.</p>
<p>The post <a href="https://frameadvisory.ca/blog/a-frame-does-two-things/">A frame does two things</a> appeared first on <a href="https://frameadvisory.ca">Frame Advisory</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<h2 class="wp-block-heading">The structure behind the wall, and the skill of framing what’s in front of it. </h2>



<p class="wp-block-paragraph">The structure behind the wall, and the skill of framing what’s in front of it. A frame does two things. It holds everything up, and it shapes how something is seen. That double meaning is the reason for the name, FRAME.</p>



<h2 class="wp-block-heading">The structure behind the wall</h2>



<p class="wp-block-paragraph">In a building, the frame is the structure behind the wall. It goes up early, disappears behind everything that follows, and still carries the weight of all of it. The word works the other way too: to frame a situation is to decide how it gets looked at, and that decides what happens next.</p>



<h2 class="wp-block-heading">FRAME does both.</h2>



<p class="wp-block-paragraph">In development, the structural frame is the sequence of decisions, the approvals path, the financial logic, who has authority to say yes, and a delivery plan that survives the first surprise. When a project stalls, this is usually where the problem is. It’s rarely the design or the site, and it often isn’t even the market. Somethings not right with the frame, or it was built for conditions that no longer exist.</p>



<p class="wp-block-paragraph">When the structure is right, a project moves without drama. Decisions get made when they need to be, approvals keep moving, and nobody is scrambling to work out who decides. Like the frame of a building, most of it goes unseen. What you see is the project standing.</p>



<h2 class="wp-block-heading">The skill of framing</h2>



<p class="wp-block-paragraph">The second meaning is a skill I bring. Every project arrives with a situation: an approval that won’t move, a market that shifted, a team that can’t agree, a site nobody has worked out how to read. How that situation gets framed decides which options are even on the table.</p>



<p class="wp-block-paragraph">The same site can be a rental, a condo, or a mixed-use anchor. The same approvals delay can be a design issue, an infrastructure issue, or a sequencing issue. Whatever the situation is, my job is to read it quickly, find the frame that fits, and change how the team looks at the project so it can start moving again.</p>



<h2 class="wp-block-heading">Why a project needs both</h2>



<p class="wp-block-paragraph">Most projects I get called about have one of the two. A constructable design with no market positioning gets built and forgotten, or ends up competing with every other project in the market that looks just like it. Or a great idea with no structure gets presented, applauded, and stalled.</p>



<p class="wp-block-paragraph">A project with the right framing stands out against its competition. It’s positioned for the buyer, renter, or commercial tenant who actually wants it, or for the investor who will back it, instead of for everyone at once.</p>



<p class="wp-block-paragraph">Sometimes the project doesn’t need to be pushed harder. It needs to be reframed. The design is good but the market logic is off. The approval issue is really an infrastructure issue. The team is capable, and nobody has defined how decisions get made.</p>



<h2 class="wp-block-heading">Where FRAME comes in</h2>



<p class="wp-block-paragraph">FRAME is senior development leadership for owners and project teams, covering both halves: the structure that lets a project move, and the perspective that makes it worth moving. Project-based, fractional, advisory, or embedded.</p>



<p class="wp-block-paragraph">If a project of yours needs one or the other, start a conversation.</p>
<p>The post <a href="https://frameadvisory.ca/blog/a-frame-does-two-things/">A frame does two things</a> appeared first on <a href="https://frameadvisory.ca">Frame Advisory</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The kitchen window</title>
		<link>https://frameadvisory.ca/blog/the-kitchen-window/</link>
		
		<dc:creator><![CDATA[FrameAdvisory]]></dc:creator>
		<pubDate>Thu, 01 Oct 2026 18:17:38 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<guid isPermaLink="false">https://frameadvisory.ca/?p=1</guid>

					<description><![CDATA[<p>To the pro forma, the kitchen window is a line item. To the person behind it, it’s every morning for the next ten years. Why a project needs both.</p>
<p>The post <a href="https://frameadvisory.ca/blog/the-kitchen-window/">The kitchen window</a> appeared first on <a href="https://frameadvisory.ca">Frame Advisory</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<div class="wp-block-columns is-layout-flex wp-container-core-columns-is-layout-056641ad wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<h2 class="wp-block-heading">Every kitchen window starts as a line item in your proforma</h2>



<p class="wp-block-paragraph">To the proforma, the kitchen window is a line item. To the person behind it, it’s every morning for the next ten years.</p>



<p class="wp-block-paragraph">Both are true. Most projects get into trouble when one is allowed to outvote the other.</p>



<p class="wp-block-paragraph">The street outside, the park at the end of the block, the light at seven in the morning. These things get into people, usually without anyone noticing until much later. Someone who buys or rents a home is trusting that the decisions made years earlier, about light, layout, and neighbourhood, were made with someone like them in mind.</p>



<p class="wp-block-paragraph">Those decisions only matter if the project gets built. That depends on things that have nothing to do with windows: an approvals path that holds, a capital structure that survives a rate change, a phasing plan that works with servicing, and a team that can actually decide. The numbers decide whether the window gets built. The thinking decides whether it was worth building.</p>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow">
<figure class="wp-block-video"><video height="1178" style="aspect-ratio: 942 / 1178;" width="942" autoplay loop muted src="https://frameadvisory.ca/wp-content/uploads/2026/08/Kitchen-window-field-notes-post.mp4" playsinline></video></figure>
</div>
</div>



<p class="wp-block-paragraph">That’s the idea behind FRAME. I’ve spent 20+ years across development, design, and ownership, in the rooms where this gets decided, or lost. What I’ve seen is that projects rarely come apart where anyone expects. It’s usually in the part that doesn’t fit one consultant’s scope: the gap between what the pro forma assumes and what the market will pay, the layer between approvals and design, or the decision everyone is waiting for someone else to make.</p>



<p class="wp-block-paragraph">That’s the work I do. Senior development leadership, brought in when it matters, without a full-time hire. Project-based, fractional, advisory, or embedded.</p>



<p class="wp-block-paragraph">If you have a project that’s stalled, shifting, or quietly getting more complicated, start a conversation.</p>
<p>The post <a href="https://frameadvisory.ca/blog/the-kitchen-window/">The kitchen window</a> appeared first on <a href="https://frameadvisory.ca">Frame Advisory</a>.</p>
]]></content:encoded>
					
		
		<enclosure url="https://frameadvisory.ca/wp-content/uploads/2026/08/Kitchen-window-field-notes-post.mp4" length="129997" type="video/mp4" />

			</item>
	</channel>
</rss>
